Not a lot happens this time of year.
It seems a long time ago that the greenhouse was put up, but it was only two weeks ago. The new staging should arrive tomorrow, so more construction fun is in store.
I spend a few hours on the allotment yesterday, and and hour or so mid week. The vandals have been back: a few sheds burnt down and others turned over. Some cold frames were smashed and water butts over-turned or punctured. Our shed was entered, but no damage done, apart from footprints over the freshly dug beds and a the compost side pushed down. Hopefully the silliness will stop.
In the garden the start of the tidy up has started,trying to make it ready for spring after the mess of putting up the greenhouse and the shed.
Inside, there are a few seedlings started, but most will still be a few weeks away... I'm waiting for T&M to deliver the main order. It was good to see how many seeds we still have from last year that should be OK. A good chunk of the order was for Captain Custard, using his free voucher that came with his RHS membership.
Sunday, January 30, 2011
Friday, January 14, 2011
The Greenhouse Part 3
Fortunately it was good weather today, the last day when Captain Custard is around before returning to Uni. The Botanical Gardens didn't realise it was a good day, so CC wasn't required there. This meant we could sort the glazing out, and generally finish of the greenhouse.
Roof and side glazed. CC couldn't escape:
Me trying to sort out the louvre:
The finished product:
Still a few things to sort out, and landscaping to do, but we transferred some strawberries in as a token of things to come.
Roof and side glazed. CC couldn't escape:
Me trying to sort out the louvre:
The finished product:
Still a few things to sort out, and landscaping to do, but we transferred some strawberries in as a token of things to come.
Thursday, January 13, 2011
The Greenhouse Part 2
It took from dawn to dusk, but the greenhouse frame has been assembled with the help of my trusty side-kick, Captain Custard.
First the sides:
Then the gable ends:
Put it all together:
Move it to the base, add a door and vent, and tighten it all up:
Easy (!!!)
Now for the glass....
First the sides:
Then the gable ends:
Put it all together:
Move it to the base, add a door and vent, and tighten it all up:
Easy (!!!)
Now for the glass....
Wednesday, January 12, 2011
The Greenhouse Part 1
At the end of last week the greenhouse arrived. Eight boxes of bits and a pile of glass. Yesterday, as soon as next door's tree and hedge had been felled/trimmed we set to work preparing the base: membrane, sand and slabs. The middle will be gravel as it will provide drainage and isn't slippy.
Stage 1 - bare level-ish ground:

Stage 2 - membrane, sand and slabs:

Stage 3 - foundations finished (and covered over):

Stage 4 - (day 2) base assembled:

Rain stopped play.
Stage 1 - bare level-ish ground:
Stage 2 - membrane, sand and slabs:
Stage 3 - foundations finished (and covered over):
Stage 4 - (day 2) base assembled:
Rain stopped play.
Subscribe to:
Posts (Atom)